D&G Contracting Ltd were chosen by main contractor Barnwood Limited to carry out the internal partitions, suspended ceilings and fire-stopping at this new manufacturing facility in Witney, Oxfordshire.
We have installed over 2500m2 of 24mm suspended grid ceilings with various tile finishes including a wipeable vinyl faced tile which was specified for the hygienic factory areas.
Our partitions package has included high acoustic rated partitions which span up-to 9m in height, these partitions are essential to reduce sound transfer from the manufacturing warehouse into the office spaces. We were also tasked with installing Metsec partitions which are designed to withstand a 500pa rating to protect the server rooms.
We have also fire-stopped over 700nr penetrations through our partition walls using high quality fire stopping materials supplied by Quelfire. For peace and mind, once fully completed our client will be handed a fully detailed report itemising each penetration along with FIRAS certification information.